Documents:

2015 Talen MT CSES CCR Fugitive Dust Control Plan-1 & 2 Bottom Ash Pond

2015 CSES Units 1-4 Annual Structural Stability Inspection Report – 12B FA

Colstrip 1&2 Bottom Ash Pond CCR Hazard Potential Classification Assessment October 2016

Colstrip 1&2 Bottom Ash Pond CCR History of Construction Report October 2016   Note: Download required to view due to size

Colstrip 1&2 Bottom Ash Pond CCR Inflow Design Flood Control System Plan October 2016   Note: Download required to view due to size

Colstrip-1-2-Bottom-Ash-Pond-CCR-Written-Closure-Plan-October-2016-12BAP

Colstrip 12 Bottom Ash Pond CCR Post Closure Plan October 2016 12BAP

Colstrip 12 Bottom Ash Pond CCR Liner Construction Documentation Report October 2016 12BAP

Colstrip 12 Bottom Ash Pond CCR Structural Stability Assessment October 2016 12BAP

Colstrip 12 Bottom Ash Pond CCR Units 12 STEP Safety Factor Assessment October 2016 BAP

2016-Colstrip-Annual-CCR-Fugitive-Dust-Control-Report-1-2-Bottom-Ash-Pond

2016-CSES-1-2-Bottom-Ash-Pond-Annual-Dam-Dike-Inspection-Report

Colstrip-1-2-Bottom-Ash-Pond-Dike-CCR-EAP

Colstrip-1-2-Bottom-Ash-Pond-CCR-Groundwater-Monitoring-Plan-Certification-Oct-2017

Colstrip-1-2-Bottom-Ash-Pond-CCR-Groundwater-Monitoring-Statistical-Method-Certification-Oct-2017

2017-Colstrip-Annual-CCR-Fugitive-Dust-Control-Report-12-Bottom-Ash

2017-CSES-CCR-Annual-Dam-Dike-Inspection-Report-1-2-BA

2017-Colstrip-CCR-Annual-Groundwater-Monitoring-Corrective-Action-Report-1-2-Bottom-Ash

Colstrip 1-2 Bottom Ash/Easier View of 2017 Colstrip CCR Annul Groundwater Monitoring Corrective Action Report 1-2 BA.pdf

Annual Emergency Action Plan Face to Face 2017 Colstrip 12 Bottom Ash Pond

CCR Rule Assessment Notification Colstrip 257.94e3_5_8_18 - 1&2 Bottom Ash Pond

CCR Rule SSL Notification Colstrip 257.95(g) - 1&2 Bottom Ash Pond

MD18058 Location Restrictions - Colstrip Reduced - 1&2 Bottom Ash Pond

Talen Colstrip 2018 Fugitive Dust Control Report - 1&2 Bottom Ash Pond

2018 CSES Annual Dam and Dike Inspection Report - 1&2 Bottom Ash

2018 Annual Groundwater Monitoring and Corrective Action Report - 1&2 Bottom Ash Pond

Notification of Assessment of Corrective Action - 1&2 Bottom Ash Pond

Assessment of Corrective Measures - 1&2 Bottom Ash

CCR Rule SSL Notification Colstrip 257.95(g) Spring 2019 - 1&2 Bottom Ash

2019 Annual Fugitive Dust Control Report - 1&2 Bottom Ash

2019 CSES Annual Inspection Report - 1&2 Bottom Ash

2019 Annual Groundwater Monitoring and Corrective Action Report - 1&2 Bottom Ash

Selection of Remedy Plant Site Final 1&2 Bottom Ash

CCR Rule SSL Notification Colstrip 257.95(g) Spring 2020 - 1&2 Bottom Ash

CCR Rule SSL Notification Colstrip 257.95(g) Fall 2020 -1&2 Bottom Ash

2020 Annual Fugitive Dust Control Report - 1&2 Bottom Ash

2020 CSES Annual Inspection Report - 1&2 Bottom Ash

2020 Annual Groundwater Monitoring and Corrective Action Report - 1&2 Bottom Ash

Plant Area Units 1&2 Bottom Ash Pond Closure NOI

Colstrip Written Closure Plan Updated May 2021 - 1&2 Bottom Ash

2021 Structural Stability Assessment - 1&2 Bottom Ash

CCR Rule SSL Notification Colstrip 257.95(g) Spring 2021 - 1&2 Bottom Ash

Fall 2021 Progress Report - 1&2 Bottom Ash

2021 Safety Factor Assessments - 1&2 Bottom Ash

2021 Annual Fugitive Dust Control Report - 1&2 Bottom Ash

2021 Annual Groundwater Monitoring and Corrective Action Report - 1&2 Bottom Ash

SSL Notification Colstrip 257.95(g) Fall 2021 - 1&2 Bottom Ash

2021 CSES Annual Inspection Report - 1&2 Bottom Ash

1&2 Bottom Ash Emergency Action Plan April 2022 - 1&2 Bottom Ash

CCR Rule SSL Notification Colstrip 257.95(g) Spring 2022 - 1&2 Bottom Ash

2022 Annual Fugitive Dust Report - 1&2 Bottom Ash

CCR Rule SSL Notification Colstrip 257.95(g) Fall 2022 - 1&2 Bottom Ash

2023 CSES Annual Inspection Report - 1&2 Bottom Ash

2022 Annual Groundwater and Corrective Action Report - 1&2 Bottom Ash

Written Closure Plan Updated June 2023 - 1&2 Bottom Ash

CCR Rule_SSL_Notificaton_Colstrip_257.95(g)_spring2023 - 1&2 Bottom Ash