Documents:

2015 Talen MT CSES CCR Fugitive Dust Control Plan-3 & 4 EHP A Cell

2015 CSES Units 1-4 Annual Structural Stability Inspection Report – EHP A

Colstrip-CCR-Written-Closure-Plan-October-2016-3-4-EHP

Colstrip-CCR-Post-Closure-Plan-October-2016-3-4-EHP

Colstrip-CCR-History-of-Construction-Report-October-2016-3-4-EHP

Colstrip-CCR-Liner-Construction-Documentation-Report-October-2016-3-4-EHP

Colstrip-CCR-Structural-Stability-Assessment-October-2016-3-4-EHP

Colstrip-CCR-Units-34-EHP-Safety-Factor-Assessments-October-2016-3-4-EHP

Colstrip-CCR-Hazard-Potential-Classification-Assessment-October-2016-3-4-EHP

Colstrip-3-4-EHP-CCR-Inflow-Design-Flood-Control-System-Plan-October-2016

2016-Colstrip-Annual-CCR-Fugitive-Dust-Control-Report-3-and-4-EHP-A-Cell

2016-CSES-3-4-EHP-A-Cell-Annual-Dam-Dike-Inspection-Report

Colstrip-3-4-EHP-A-Cell-CCR-EAP

Colstrip-3-4-EHP-A-Cell-CCR-Notification-of-Intent-to-Close-June-2017

Colstrip-3-4-EHP-a-Cell-CCR-Groundwater-Monitoring-Plan-Certification-Oct-2017

Colstrip-3-4-EHP-a-Cell-CCR-Groundwater-Monitoring-Statistical-Method-Certification-Oct-2017

2017-Colstrip-Annual-CCR-Fugitive-Dust-Control-Report-34-EHP-A

2017-CSES-CCR-Annual-Dam-Dike-Inspection-Report-3-4-EHP-A

2017-Colstrip-CCR-Annual-Groundwater-Monitoring-Corrective-Action-Report-3-4-EHP-A

Colstrip 3-4 EHP A/Easier View of 2017 Colstrip CCR Annul Groundwater Monitoring Corrective Action Report 3-4 EHP A.pdf

Annual Emergency Action Plan Face to Face 2017 Colstrip 34 EHP A Cell

CCR Rule Assessment Notification Colstrip 257.94e3 5_8_18 - 3&4 EHP A Cell