Colstrip 1 & 2 Bottom Ash Pond

Documents: 

2015 Talen MT CSES CCR Fugitive Dust Control Plan-1 & 2 Bottom Ash Pond

2015 CSES Units 1-4 Annual Structural Stability Inspection Report – 12B FA

Colstrip 1&2 Bottom Ash Pond CCR Hazard Potential Classification Assessment October 2016

Colstrip 1&2 Bottom Ash Pond CCR History of Construction Report October 2016
  Note: Download required to view due to size

Colstrip 1&2 Bottom Ash Pond CCR Inflow Design Flood Control System Plan October 2016
  Note: Download required to view due to size

Colstrip-1-2-Bottom-Ash-Pond-CCR-Written-Closure-Plan-October-2016-12BAP

Colstrip 12 Bottom Ash Pond CCR Post Closure Plan October 2016 12BAP

Colstrip 12 Bottom Ash Pond CCR Liner Construction Documentation Report October 2016 12BAP

Colstrip 12 Bottom Ash Pond CCR Structural Stability Assessment October 2016 12BAP

Colstrip 12 Bottom Ash Pond CCR Units 12 STEP Safety Factor Assessment October 2016 BAP

2016-Colstrip-Annual-CCR-Fugitive-Dust-Control-Report-1-2-Bottom-Ash-Pond

2016-CSES-1-2-Bottom-Ash-Pond-Annual-Dam-Dike-Inspection-Report

Colstrip-1-2-Bottom-Ash-Pond-Dike-CCR-EAP

Colstrip-1-2-Bottom-Ash-Pond-CCR-Groundwater-Monitoring-Plan-Certification-Oct-2017

Colstrip-1-2-Bottom-Ash-Pond-CCR-Groundwater-Monitoring-Statistical-Method-Certification-Oct-2017

2017-Colstrip-Annual-CCR-Fugitive-Dust-Control-Report-12-Bottom-Ash

2017-CSES-CCR-Annual-Dam-Dike-Inspection-Report-1-2-BA

2017-Colstrip-CCR-Annual-Groundwater-Monitoring-Corrective-Action-Report-1-2-Bottom-Ash

Colstrip 1-2 Bottom Ash/Easier View of 2017 Colstrip CCR Annul Groundwater Monitoring Corrective Action Report 1-2 BA.pdf

Annual Emergency Action Plan Face to Face 2017 Colstrip 12 Bottom Ash Pond

CCR Rule Assessment Notification Colstrip 257.94e3_5_8_18 - 1&2 Bottom Ash Pond